|
|
|
|
05/16/2008 12:45 AM Suncruiser Prototype Images while under construction
|
5-15-08
5-9-08
Painting everything, will start other side rail next .





Top step taken out to match lowered floor
Then you can see a ramp to gradually get to normal floor height at stairway




5-8-08
Preparing to close up the outside




5-6-08
4-24-08
Prototype Test images ....
Tomorrow we will work on how to make this window look like it belongs there ..




4-23-08
Sizing for new upper side wall




Lowered drivers celiing



New Lowered floor,
Top step is gone now, Floor down by 4" and drivers ceiling lowered now .

4-21-08
Ceiling coming out making room for stairway ..





Stairway up over driver roughed in, Upper side wall Frame laid out



Cutting opening in the roof for stairway to upstairs ..



Over the driver before cutting..

4-14-08





Starting to weld body back down


Making the top windshield from another bus front end,




Removing the marquee sign



Designing and modifying another front cap roof trim to top off the
windshield ..




4-11-08
We cut the bus down about 14" . To get a feel of where we should be. Then
we put one of the men on top and it sized up perfectly ..








4-10-08
Note Chain hoist supporting roof
Right side ,
Left side






4-7-8
Just pulled in ,..
Prepping to see where we need to cut and chop off ..



Chair on roof to give an idea of where we want to go ..



We will lower the roof approximately 2'



Inside we will bring present ceiling height from 7' down to 5' on the
inside .
We pull the engine / transmission to send out and then we clean all the frame as
if new again ...
Then we rebuild the entire drive train to be almost new again ..



Contact :610-767-8000
tech@walkercustomer.com
|
|