04/27/2008 09:47 PM
Luxury Dbl Deck II
#7001
Next Level Coach, Inc
Super Luxurious Double Decker Motor Coach
Ultra High End
Custom
Double Decker Luxury Motor Coaches
The main infrastructure work is done and at 90% completion it has been moved to California to have the interior finished out.
Below
is a range of links and images that will take you to that area of construction
,....
Links to this page , (no order at the moment)
Samples of the Cherry Wood interior
Doors,
Fiberglass rear section started,
Fiberglass front end started,
Downstairs couches,
Wall Panels,
Curved Stairway,
Dell computer touch screen,
Main Breaker Panel,
Rear End Lighting,
Rear End Fiberglass lighting,
Holding Tanks,
Holding Tanks Gauges in Galley,
Exterior driver area,
Upstairs front salon floor work,
Interior cabinetry upper salon,
Upper Salon TV,
Interior cabinetry, lower front,
Interior Galley,
Interior Cabinetry rear Galley,
Suspension rebuilt,
All aluminum skin finished,
Exterior Skins,
Upper Windshield Installed,
Rear End new lower
profile satellite dish,
Exterior Skin,
Early Interior Upper ceiling,
Early interior Drivers area,
Shell Structurally completed,
Stretching the bus to 45' in
length
|
Driver compartment
wiring,
Engine / Transmission Install,
Front end wiring,
Fiberglass tailgate,
Stairway,
Double Pane windows
More wiring, sloppy
looking now ,
Holding tanks and wiring,
Interior Cabinetry,
Upper rear
galley,
Infrastructure done now to Ca
Rear Engine control wiring,
Holding Tanks bay doors,
Heavy Mounting bracket for
the TV, Air
Conditioning,
Upholstery work on couches,
Toe kick heater and
wiring installation,
Dash wiring,
Installed driver and
copilot windows |
4-4-08
Infrastructure done, Now to California
Now it's on the way to California for the final fittings ..
  
4-1-08
Installed last of Double pane windows
   
White sealer
will be cut off later when cured .
   

Fiberglass front end started,
Fiberglass, rear sections started
  
 
Upholstery work on
couches,
Back to top of page
Keep scrolling down to see finished upholstery ..
Building the right size cushions
   
   
   
   
   
Upper Salon Couches and TV
Back to top of page
Looking forward to the TV covered with cardboard in front of upper windshield.
   
Upper salon TV between couches

Sizing leather Corner,
   
Note the leather skins are very loose and subtle because we have removed
all frame structure .
   
We have stripped it down to just the leather hides and will reconstruct a closer
fitting inside corner unit .
   
Downstairs Couches,
Back to top of page
Looking a little more straight now .
   
   
Designing storage area behind couch
 
Upper salon TV
Back to top of page
   
  
Stairway
Back to top of page
New curved Stairway completed
   
   
   
   
   
Main Breaker panel
Back to top of page
 
   
Upstairs Front salon
Floor work,
Back to top of page
.. In order to make room for the recliner we needed to
modify the floor a little .
   
  
Before new floor modifications
After the new floor modifications
   
Interior cabinetry upper front
salon
Back to top of page
  
Interior cabinetry,
lower front
Back to top of page
   
Interior Cabinetry, Upper rear
galley
Back to top of page
  
Interior Galley,
Back to top of page
We finally figured a way we could have all the appliances,
larger granite counter top and the most storage possible. .
   
   
   
Wall panels
for the upholstery
Back to top of page
   
   
   
Front end wiring,
Early interior, Drivers area,
Back to top of page
   
 
Dash wiring,
Back to top of page
17" Touch Screen Dash
System,... DOT requires analog back up to solid state system,
   
   
  
More information on this solid state dash unit, (large image)
More information on this system.
http://busconversion101.com/Dash_UpGrades.htm
Driver compartment wiring,
Back to top of page
   
Holding tanks and wiring.
Back to top of page
Holding Tanks
More and more wiring, sloppy
looking now but will be very neat when finished,
Holding tank, Inverter gauges in galley
Back to top of page
  
   
   
   
 
Holding Tanks bay doors ,
Back to top of page
Holding tank walk in door
   
Designing and building
Back to top of page
Heavy Mounting bracket for the TV Over
the entrance /
stairway.
We want to prevent the TV from wobbling so we reinforced the TV
itself then designed a heavy mounting brace.
   
   

Toe kick
heater and wiring installation
Back to top of page
 
Air Conditioning
   
Rear end, lighting
Back to top of page
   
Rear End, Fiberglass fender
lighting to be built into the other
fiberglass parts .
   
Rear Engine control wiring, Airline
system completely rebuilt
Back to top of page
   
Engine / Transmission Install
Back to top of page
   
  
 
Exterior driver area,
Back to top of page
   
Suspension rebuilt
Back to top of page
   
  
Rear
End, Newer style low profile satellite dish.
Back to top of page
   
  
Exterior Skins,
Back to top of page
Shell structurally completed now
ready to start rebuilding and assembly
All aluminum skin finished,
Exterior Skin,
Upper windshield installed
Early interior, upper
ceiling,
Back to top of page
   
   
 
  
   
Stretching the bus to 45' in length
Back to top of page
   

Samples of the Cherry
Doors
and curves
Back to top of page
  
Home
Back to top of page
|