N L C 7001

Home
Buses For Sale
MCI 9 Conv List
MCI 102 Conv List
Raising a Roof
Limo Party Bus I
Limo Party Bus II
Next Level Coaches
N L C    7001
Suncruiser
Scenicruiser 4501
Stretched Van
Factory
Interior Samples
Vendor Page

09/05/2008 08:55 PM       

Next Level Coach, Inc     Model   7001
Super Luxurious Neoplan Skyliner Double Decker Motor Coach

High End Double Decker Luxury Buses & Motor Coaches
                 
The main infrastructure work is done and at  95% completion it has been moved to California to have the interior finished out.

One of a few Custom designed chassis's designed around 6'2" people to walk in comfortably.

Below is a range of links and images that will take you to that area of construction ,....


17"Touch Screen Dash

 

Stretching to 45'

Links to this page , (no order at the moment)

Samples of the Cherry Wood interior Doors,
Fiberglass rear section started,     Fiberglass front end started,     Downstairs couches,     Wall Panels,     Curved Stairway,     Dell computer touch screen,    
Main Breaker Panel,     Rear End Lighting,     Rear End Fiberglass lighting,     Holding Tanks,   
Holding Tanks Gauges in Galley,      Exterior driver area,     Upstairs front salon floor work,     Interior cabinetry upper salon,     Upper Salon TV,     Interior cabinetry, lower front,     Interior Galley,     Interior Cabinetry rear Galley, Suspension rebuilt,    All aluminum skin finished,     Exterior Skins,      Upper Windshield Installed,     Rear End new lower profile satellite dish,     Exterior Skin,     Early Interior Upper ceiling,     Early interior Drivers area,     Shell Structurally completed,     Stretching the bus to 45' in length
Driver compartment wiring,     Engine / Transmission Install,    Front end wiring,    Fiberglass tailgate,     Stairway,   Double Pane windows
More wiring, sloppy  looking now ,   
Holding tanks and wiring,     Interior Cabinetry, Upper rear galley,    Infrastructure done now to Ca
Rear Engine control wiring,    Holding Tanks bay doors,    Heavy Mounting bracket for the TV,    Air Conditioning,   
Upholstery work on couches,    Toe kick heater and wiring installation,     Dash wiring,   
Installed driver and copilot windows

Progression Images, Most Recent on Top ....

4-4-08
Infrastructure done, Now to California
Now it's on the way to California for the final fittings ..

4-1-08
Installed last of Double pane windows

White  sealer will be cut off later when cured .

Fiberglass front end started,
Fiberglass, rear sections started




Upholstery work on couches,                                                                                            Back to top of page 

Keep scrolling down to see finished upholstery ..
Building the right size cushions







Upper Salon Couches and TV                                                                                                             Back to top of page
Looking forward to the TV covered with cardboard in front of upper windshield.

Upper salon TV between couches


Sizing leather Corner,

 Note the leather skins are very loose and subtle because we have removed all frame structure .


We have stripped it down to just the leather hides and will reconstruct a closer fitting inside corner unit  .

Downstairs Couches,                                                                                                                                            Back to top of page
Looking a little more straight now .


Designing storage area behind couch


Upper salon TV                                                                                                                                    Back to top of page



Stairway                                                                                                                        Back to top of page
New curved Stairway completed










Main Breaker panel                                                                                                                        Back to top of page

Upstairs Front salon Floor work,                                                                                                                       Back to top of page
.. In order to make room for the recliner we needed to modify the floor a little .

Before new floor modifications                                                          After the new floor modifications


Interior cabinetry upper front salon                                                                                                                       Back to top of page


Interior cabinetry, lower front                                                                                                                       Back to top of page


Interior Cabinetry, Upper rear galley                                                                                                                       Back to top of page

Interior Galley,                                                                                                                        Back to top of page
We finally figured a way we could have all the appliances, larger granite counter top and the most storage possible. .


Wall panels  for the upholstery                                                                                                                         Back to top of page






Front end wiring,     Early interior, Drivers area,                                                                                                                       Back to top of page




Dash wiring,                                                                                                                       Back to top of page
17" Touch Screen Dash System,...  DOT requires analog  back up to solid state system,





More information on this solid state dash unit, (large image)

More information on this system.     http://busconversion101.com/Dash_UpGrades.htm

Driver compartment wiring,                                                                                                                       Back to top of page


Holding tanks and wiring.                                                                                                                       Back to top of page
Holding Tanks
More and more wiring, sloppy  looking now but will be very neat when finished,
Holding tank, Inverter gauges in galley                                                                                                                       Back to top of page
 





Holding Tanks bay doors ,                                                                                                                       Back to top of page
Holding tank walk in door


Designing and building                                                                                                                        Back to top of page
Heavy Mounting bracket for the TV Over the entrance / stairway.
We want to prevent the  TV from wobbling so we reinforced the TV itself then designed a heavy mounting brace. 


Toe kick heater and wiring installation                                                                                                                        Back to top of page

Air Conditioning

Rear end, lighting                                                                                                                        Back to top of page

Rear End, Fiberglass fender lighting to be built into the other fiberglass parts .


Rear Engine control wiring, Airline system completely  rebuilt                                                                                                                        Back to top of page


Engine / Transmission Install                                                                                                                       Back to top of page



  
Exterior driver area,                                                                                                                       Back to top of page

 

Suspension rebuilt                                                                                                                       Back to top of page

Rear End, Newer style low profile satellite dish.                                                                                                                       Back to top of page


Exterior Skins,                                                                                                                              Back to top of page
Shell structurally completed now ready to start rebuilding and assembly
All aluminum skin finished,    Exterior Skin,    Upper windshield installed
Early interior, upper ceiling,                                                                                                            Back to top of page









Stretching the bus to 45' in length                                                                                                                    Back to top of page

Samples of the Cherry Doors and curves                                                                                                                        Back to top of page

Home                                                                                                                       Back to top of page