|
April 22, 2008 06:16 PM
9003 2006
4-6-06 to 7-21-06
|
Most
Recent Images on Top ....
|
7-21-06
   
   
Cleaning, Priming, Painting ..Then categorizing and shelving
until reassembly
   
7-19--06
   
Parts back from Bead blasting
   
Bead Blasted, Cleaned, Primed and finish Painted .
Now this front axle will be stored on a shelf and wait its turn in
reassembly
7-18-06
  
Cleaned, Prepped and Primed
7-17-06
  
Bead Blasting, Wire brushing, cleaning and prepping for paint finish.
7-14-06
   
Blasting , Cleaning , Priming
6-21-06
   
   
   
   
6-13-06
  

 
Still wire wheeling every square inch ..
5-31-06
  
New under coat waiting to be applied
  

 
Main Cabin Heater fan will be removed and rebuilt
  

This Air tank has a rusted hole and will need
rebuilding or patching
5-24-06
  
  
   
 
  
  

5-23-06
  
  
  
  
Air tank has suspected rusted hole
Note: wet spot on tank
5-22-06
  
  
Power steering box needs seals ..
Note: poor attempt to patch air bag ( it did work but not reliable)
  
  
  

 
5-9-06
  
4-27-06
  
  
  
 
4-21-06
   
   
   
 
4/14/2006
   
   
   
   
   
   
  
4/7/2006
   
   
   
   

4/06/2006
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
4-21-06
   
   
   
 
4/14/2006
   
   
   
   
   
   
  
4/7/2006
   
   
   
   

4/06/2006
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
|